(原文) My more than thirty (30) years of experience in Pressure Vessel – Static Equipment allowed me to be proficient and competent in performing the following engineering works : -Preparation of Equipment Data Sheet, Loading Data and Work Volume and Material Requisition for different kinds of Static Equipment such as Columns, Vessels, Filters, Deaerators, Shell and Tube Heat Exchangers, Air Cooled Heat Exchanger, Plate Type Exchangers, Aluminum Core and Compabloc Type Exchangers, Reactors, Combustion and Mixing Chambers and Tray and Packing Data Sheet. - Technical and Commercial Bid Evaluations of Vendor Proposals - Preparation of Technical Evaluation Summary and Clarification,Exception and/or Deviation Summary to determine and evaluate the most viable and acceptable Vendor Proposals. - Review and checking of Vendor Fabrication Drawings and Design Documents - Project Coordination with Client and Sub-Contractors. Have technical knowledge with the requirements of International Codes and Standards such as ASME Code, API, ANSI, ASTM and various Client Specifications such as ExxonMobil, Qatar Gas, Ras Laffan, Shell DEP, INPEX Browse Ltd., Woodside Energy, LNG Canada, Saudi Chevron, Flint Hill Resources Pine Bend LLC, Lake Charles LNG Export LLC & BG LNG Services and others. ----- With over 30 years of dedicated expertise in Pressure Vessel – Static Equipment engineering, I offer a proven track record of excellence in a wide array of essential services in Detailed Engineering, Vendor Proposal Evaluation, Design Review and Coordination, Standards Compliance. My extensive experience, coupled with a commitment to precision and compliance with industry standards, ensures seamless project execution and optimal equipment performance.
(原文) Chiyoda Corpooration (thru Arrow Human Resources Co.,Ltd),Yokohama, Japan <2001~March 2017><1992~1998> ----- Position: Static Equipment Engineer ----- Projects Involved: - Coker Replacement Project (Flint Hill Resources Pine Bend, LLC) - Ichthys Onshore LNG Facilities - Combined Cycle Power Plant (INPEX Browse Ltd.) - Turkmenistan Galkynysh Gas Processing Project (State Concern Turkmengas) - Lake Charles Liquefaction Project (Lake Charles LNG Export and BG LNG Services, LLC) - CEPU JTB Gas Development Project (PT Pertamina EP CEPU) - LNG Canada Project - FEED and EPCM Services (LNG Canada Development Inc.) - Turkmenistan Galkynysh Gas Processing (State Concern Turkmengas) - Ichthys Onshore LNG Facilities - Utilities and Offsite (INPEX Browse Ltd.) - Browse Downstream Gas Development Project (Woodside Energy Position) - Barzan Onshore Project - FEED (RasGas Company Limited) - Nghi Son Refinery and Petrochemical Complex (NSRP Limited Liability Company) - RasGas Onshore Expansion Project (Phase 2 - Train 6 and Train 7) (Ras Laffan Liquefied Natural Gas Company Limited) - Al-Khaleej Gas (AKG) Project (Phase 1 and Phase 2) (ExxonMobil Middle East Marketing Ltd.) - RasGas Onshore Expansion Project (Phase 1- Train 3 ~ Train 5) (Ras Laffan Liquefied Natural Gas Company Limited) - Qatar Gas LNG Project (Train 1 ~ Train 3 & Deisopentanizer Unit) (Qatar Liquefied Gas Company Limited) - Saudi Chevron Petrochemical Aromax®, Benzene and Cyclohexane Project (Saudi Chevron Petrochemical) - Sharq Second Expansion Project (Eastern Petrochemical Company) ----- Primary Responsibilities: - Preparation of Material Requisition - Technical and Commercial Bid Evaluation of Vendor Proposal - Project Coordination with Client and Sub-Contractor - Review of Vendor Fabrication Drawings and Design Documents
1999 - 2000
東洋エンジニアリング株式会社 - 習志野市、日本 (派遣:アロー・ヒューマン・リソーシズ所属)
検査員
1a) 主要プロジェクトと業績*
MEOGプロジェクトチーム(アロマティックス・マレーシアSdn. Bhd)
1b) 主な責務*
検査リリース証明書(配管およびバルク材料)の準備
(原文) Toyo Engineering Corporation, Chiba, Japan (thru Arrow Human Resources Co.,Ltd) <1999 ~ 2000> ----- Position: Inspector ----- Project Involved: MEOG Project Team (Aromatics Malaysia Sdn. Bhd) ----- Primary Responsiblities: Preparation of Inspection Release Certificate (Piping and Bulk Materials)
1989 - 1992
アジア・ブルワリー株式会社 - ラグナ州、フィリピン
アシスタントエンジニアリングマネージャー(機械工学部門)
1a) 主要プロジェクトと業績*
---
1b) 主な責務*
醸造所およびユーティリティセクションのアップグレードを担当
既存のシステム/設備の改訂案のレイアウトと計画の準備
費用見積もりとスケジュールの準備
設備と材料の調達
プロジェクトの監視と管理
(原文) Asia Brewery Incorporated, Laguna, Philippines <1989~1992 ----- Position: Assistant Engineering Manager (Mechanical Engineering Department) ----- Primary Responsibilities: - In-charge with Upgrading of Brewery and Utility Section - Preparation of Layout and Scheme for the Proposed Revisions of Existing System/Equipment - Preparation of Cost Estimates and Schedules - Equipment and Material Procurement - Project Monitoring and Supervision