(原文) Has 11 (eleven) years of work experience in piping engineering tasks in conceptual design, proposal projects and detailed engineering (EPC), for general industry that includes oil and gas, chemicals, mining and industrial plants. Experienced in project planning, vendor data verification, and interdisciplinary coordination, including managing project issues, quality, and schedules. Skilled in information dissemination, technical discussions, and field engineering, such as line checking, pre-commissioning, and construction supervision. Knowledgeable in ASME, SAES, and other industry standards. Experienced in multicultural environments, including overseas project execution, and has collaborated with a Professional Engineer on engineering submissions for Singapore’s Building and Construction Authority.
SKILLS 技能・語学
日本語
基本的な挨拶ができるレベル
英語
流暢に会話ができるレベル
PCスキル
SmartPlant 3D / AutoCAD Plant 3D / Autocad / OpenPlant Modeller / AECOsim / Microstation / Microsoft Office applications and 3D review tools / SmartPlant Review and Navisworks.
EDUCATION 学歴
2007 - 2012
Technological University of the Philippines - イロイロ市、フィリピン
(原文) Mectec Engineering Pte. Ltd., Singapore <April 2022 – Present> Position: Project Engineer (EPC) ----- Project Involved: - Siltronics Project - EPC and on-site <April 2022 – December 2023 > - CRISP Project- Detailed Engineering <January 2024 – March 2024> - Soitec Project - EPC and on-site <April 2024 – Present > ----- Primary Responsibilities: - Involvement in planning and project management. - Discussion meetings with the client for strategies that will be implemented for the project. - Delegation and educating project members prior to activities. - Periodic progress monitoring. - Attend queries and provide engineering assistance to the construction team. - Issuance of field change and site instructions to site. - Implementing work-flows to streamline project activities and to keep reliable historical data - Updating of engineering drawings as per actual site condition. - Discussion meetings with the Professional Engineer for their calculation, endorsement, and submission of engineering drawings to the Building and Construction Authority of Singapore.
(原文) Cybalink Solutions, Inc. Taguig, Philippines <July 2021 – November 2021> ----- Position: Piping Designer ----- Project Involved: - Motheo Copper Project- EPC <September 2021 – November 2021> ----- Primary Responsibilities: - Performs Piping, Equipment and Structural modeling based on Piping Layouts thru Openplant Modeller. - Drawing preparations; Interprets P&ID, Piping Information, Piping Layout, Line Index, Vendor Drawings and other Project Specifications in producing Piping deliverables such as Isometric and Plan Drawing. Uses Microstation for the annotation of the drawings.
2013 - 2021
JGC Philippines, Inc - マンティンルパ市、フィリピン
Custom Margin Above and Below Elements
現場リードパイピングエンジニア
アシスタントパイピングエンジニア
パイピングエンジニア
現場パイピングスーパーバイザー
主要プロジェクトと業績*
ジャザン製油所プロジェクト <2013年5月 – 2016年9月>
NSRPベトナム現場 <2016年10月 – 2017年2月>
FGEN提案プロジェクト <2017年3月 – 2017年6月>
ユーロ5提案プロジェクト <2017年7月 – 2017年12月>
Pilipinas Kao, Inc. PFMプロジェクト <2018年1月 – 2018年10月>
KNPCクリーンフューエルプロジェクト(現場) <2018年11月 – 2019年2月>
Pilipinas Kao, Inc. TA3プロジェクト(現場) <2019年3月 – 2021年2月>
(原文) JGC Philippines, Inc. Muntinlupa, Philippines <January 2013 – July 2021> ----- Position: Onsite Lead Piping Engineer/Assistant Piping Engineer/Piping Engineer/Onsite Piping Supervisor ----- Project Involved: - JAZAN Refinery Project <May 2013 – September 2016> - NSRP Vietnam Site <October 2016 – February 2017> - FGEN Proposal Project <March 2017 – June 2017> - Euro 5 Proposal Project <July 2017 – December 2017> - Pilipinas Kao, Inc. PFM Project <January 2018 – October 2018> - KNPC Clean Fuels Project (onsite) <Nov 2018 – February 2019> - Pilipinas Kao, Inc. TA3 Project (onsite) <March 2019 – February 2021> - Bamboo Shell PJ <March 2021 – June 2021> - Talison Mine Services Area <July 2021 – August 2021> ----- Primary Responsibilities: (As Onsite Lead Piping Engineer/Onsite Piping Supervisor/Piping Engineer) - Involvement in safety awareness training and execution at site. - Discussion meetings for execution and strategies that will be implemented for the project. - Delegation and educating project members prior to activities. Leads 3 piping field engineers. - Periodic monitoring of BM BQ growth - Attend queries and provide engineering assistance to the construction team. - Issuance of field change and site instructions to site. - Implementing workflows and controls such as Construction Management System database. - Presides 3D model review conferences with clients and discusses necessary actions for projectdesign development. - Presents lessons learned to the piping department after conclusion of the project.- Supports construction team on line checking of test packages prior to mechanical completion. - Attends queries from supervisors and provides them engineering guidelines based on project standards and specifications. - Checking and review of vendor drawings conforming to applicable project requirements. - Updating engineering drawings such as P&ID, isometric, and mechanical stress sketch based on actual site conditions. - Participation in discussion with clients in closing construction comments. - Coordination with multinational engineering disciplines. - Performs Test Package and System line check - Prepares markup drawings for walk around comments using plan drawing - Coordinates and consult with Field Engineer for any technical issues and clarification that may arise - Provides Isometric draft revision for As built works. - Uses Naviswork for model review.|
(As Assistant Lead Piping Engineer/Piping Design Engineer) - Leads 13 piping engineers for the preparation of piping 3D model for material take-off and BM BQ estimation. - Checking and review of plot plan for equipment safety spacing and design development. - Preparation of piping layout around tanks, pump, heat exchangers with compliance to projectspecifications and standards. - Checking and review of piping tie in with other disciplines such as equipment, instrument, and civil structure clashings - Drawing preparation of piping loading information to other disciplines such as structures, equipment nozzles and platforms. - Attends a 3D model review conference with clients and discusses necessary actions for project design development. - Attends P&ID review together with clients and other disciplines. - Preparation of piping 3D model for material take-off and BM BQ using AutoCAD Plant 3D. - Preparation of piping loading information to other engineering disciplines for their structural drawings, equipment platform drawings, nozzle orientations, as well as pipe clashing detection. - Preparation of stress sketch drawings to be used by Piping Stress Engineer to model in CAESAR II. - Preparation of pipe supports drawings. - Plot plan and lay out design development based on ITB documents provided by the client. - Performs Piping, Equipment and Structural modeling based on Piping Layouts thru Smart Plant 3D(SP3D). - Prepares plot plan which requires update and revision. - Interprets P&ID, Piping Information, Piping Layout, Line Index, Vendor Drawings and other Project Specifications in producing Piping deliverables. - Prepares Isometric drawings and Plan Drawings.