As a Piping Stress Engineer, I have a track record spanning from February 2014 to the present, specializing in pipe stress engineering compliant with ASME B31.1/B31.3 codes, utilizing CAESAR II and AutoPipe programs. My expertise involves evaluating nozzle loads with WRC 107/297 and Finite Element Analysis.
I excel in complex engineering tasks, computation, and evaluation, always striving for precision and efficiency. I extract engineering data from CAD drawings and computer models, coordinating the design of unique pipe supports when necessary, and updating calculation notes.
Additionally, I conduct surge analysis, thermal bowing assessments, flange leak checks, and design piping around safety valves using API 520 or ASME B31.1. I'm proficient in evaluating pipe supports through Finite Element Analysis. During my tenure as Piping Stress Lead Engineer at Chiyoda Philippines Corporation from February 2017 to March 2021, I oversaw junior engineers, created stress critical line lists, coordinated with equipment vendors, and prioritized tasks for efficient project management.

自己PR
I am a dedicated and hardworking person. I am confident in my pipe stress expertise and am confident that I will meet your expectations.


SKILLS
技能・語学

  • Japanese

Basic greeting level

  • English

Fluent

  • Computer Software

MS Office, Autopipe, Caesar II, FEA (RPG), Naviswarks, Autocad, BlueBeam, Adobe Acrobat, FEA Translation by Hexagon


EDUCATION
学歴

2008 - 2013

Batangas State University

Bachelor of Science in Mechanical Engineering

WORK EXPERIENCE
職歴

2022 - present

JGC Philippines

2014 - 2021

Chiyoda Philippines Corporation

  1. Chiyoda Yokohama Japan <2017> and <2019>

1

Piping Stress Engineer

JGC Philippines Manila Operation Center <2022 - present>

Projects Involved:

  • CPC3 Project (Phase 3 Expansion)

Primary Responsibilities:

  • CAESAR II Calculation Input and Analysis mainly for LNG Loading Line, Surge Analysis, Thermal Bowing Lines and BOG Compressor Calculation
  • Support Span Calculation and Creation
  • Critical Linelist and Mark-up P&ID Creation
  • Supports Area Lead Engineer for Creation of Specification (Pipe Stress Analysis and Support Standard for the project since client is requesting Stainless Steel for most of the pipes including pipe supports)
  • Coordinate with several Tie-in project contractors for upstream data needed for piping stress calculation
  • Provide efficient solutions for pipe routing with precise coordination with related designer
  • Submission of Piping Loading Data to Civil/Structural Group
  • Technical Bid Evaluation for related supports – Springs, Struts,Snubbers, Cold Shoes, Cold Block and Sliding Plate(PTFE) as required by Piping Support Specification
  • Participates in 30%, 60%, and 90% Comment Model Revie

2

Piping Stress Engineer

Chiyoda Philippines Corporation Office <2014 - 2021>
 

(1a) Projects Involved:

  • Golden Pass Project <2020 - 2021>

(1b) Primary Responsibilities:

  • Over-all responsible for ISO-Sign Off for the COLD area, which includes checking of overall support tags and consistency check of Engineering Isometric and Stress Isometric
  • CAESAR II Calculation Input and Analysis for Pump/Chiller/Surge/Slug-Flow/Thermal Bowing Calculation
  • CAESAR II Calculation Checking and Assistance for Junior Stress Engineer
  • Performs NozzlePro Calculation for Nozzle Loads which exceeds Vendor Allowable and Coordinates these Nozzles at COLD Area to Vendor
  • Checking of allowable load at special supports such as spring and strut to be used at Steam Turbine and Compressor Calculations
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard Page 4
  • CAESAR II Load Case Combination Creation to be used for the whole project

 

(2a) Projects Involved:

  • GYO Project <2019>

(2b) Primary Responsibilities:

  • Overall responsible for ISO-Sign Off for STEAM/COLD area which includes checking of overall support tags and consistency check of Engineering Isometric and Stress Isometric
  • CAESAR II Calculation Input and Analysis for Steam Turbine/Compressor/Slug-Flow/Thermal Bowing/Transportation Calculation
  • CAESAR II Calculation Checking and Assistance for Junior Stress Engineer
  • Performs NozzlePro Calculation for Nozzle Loads that exceeds Vendor Allowable and Coordinates these Nozzles at STEAM/COLD Area to Vendor
  • Checking of special supports such as spring and strut to be used at Steam Turbine and Compressor Calculations
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard

 

(3a) Projects Involved:

  • IGL Project (Combined Cycle Power Plant Area) <2019>

(3b) Primary Responsibilities:

  • CAESAR II Modelling, Input, and Analysis using General Arrangement Drawing for Steam Turbine/Condenser/Mud Drum/PSV Umbrella Piping
  • Creation of Nozzle Load Evaluation of Steam Turbine by GE using Excel sheet formulas
  • Checking of Spring/Strut Data Sheets to be submitted for Purchase Order

 

(4a) Projects Involved:

  • Tangguh LNG Project <2017 - 2019>

(4b) Primary Responsibilities:

  • CAESAR II Modelling, Input and Analysis using Engineering Isometric sent by JV. Complex analysis such as OBE,SSE (seismic cases) were applied to BOG Compressor Calculation and MCHE calculation (APCI scope included). Springs were also checked to be within its variability Page 5
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard
  • CAESAR II Calculation Checking and Assistance for Junior Stress Engineer
  • Main coordinator for queries and analysis for CAESAR II Calculations
  • GRP Calculation using code ISO 14692 (F/A stresses were included)
  • Flange Leakage by NC 3658.3 (Alternate evaluation)
  • Snubber and Spring Design at BOG Compressor (OBE, SSE seismic cases were considered for NEMA SM23 Evaluation)

 

(5a) Projects Involved:

  • Petron Bataan FRP <2018>

(5b) Primary Responsibilities:

  • GRP Calculation Check by ISO 14692 on Seawater Pump Lines
  • Site visit for check of Piping Support on Seawater Pump Lines

 

(6a) Projects Involved:

  • RGTF Project <2016 - 2017>

(6b) Primary Responsibilities:

  • CAESAR II Modelling, Input, and Analysis using Engineering Isometric sent by Chiyoda Singapore. At Tank Nozzles, the bulging effect and Pulsation Analysis(4th mode of natural frequency used with linear analysis plus consistent type for modal analysis). Surge forces were used at ESDV near Tank Nozzles and Shut-Down Cases of Pumps
  • Indicates correct support tag as per CAESAR II Calculation
  • CAESAR II Calculation Checking and Assistance for Junior Stress Engineer
  • Spring Checking and Selection on Piping at Pumps near the tanks
  • API 650 Bulging Effect Calculation(Appendix P) for Tanks and Soil Settlement Consideration for Supports
  • Peq Method for Flange Leak. Alternatively, ASME VII Div.2 for flanges having high stresses Petron Bataan FRP
  • GRP Calculation Check by ISO 14692 on Seawater Pump Lines
  • Site visit for check of Piping Support on Seawater Pump Lines

 

(7a) Projects Involved:

  • Freeport Project <2016>

(7b) Primary Responsibilities:

  • ISO-Sign for COLD area, which includes checking of overall support tags and consistency check of Engineering Isometric and Stress Isometric
  • CAESAR II Calculation Input and Analysis for COLD area Page 6
  • Assist Area Lead Engineer with Control and Handover items
  • Coordinate any queries to be performed by the Company
  • Performs NozzlePro Calculation for Nozzle Loads which exceeds Vendor Allowable
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard
  • Upload of Calculation Packages to be submitted to Client

 

(8a) Projects Involved:

  • Yamal LNG Project <2015>

(8b) Primary Responsibilities:

  • CAESAR II Calculation Input and Analysis for Piperack and PSV Piping, including Snow Load and Sea Transportation
  • Performs NozzlePro Calculation for Nozzle Loads
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard

 

(9a) Projects Involved:

  • Cameron Project <2014 - 2015>

(9b) Primary Responsibilities:

  • ISO-Sign for HOT area, which includes checking of overall support tags and consistency check of Engineering Isometric and Stress Isometric
  • CAESAR II Calculation Input and Analysis for HOT area
  • Performs NozzlePro Calculation for Nozzle Loads which exceeds Vendor Allowable
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard
  • Upload of Calculation Packages to be submitted to Client

 

(10a) Projects Involved:

  • IGL Project <2014 - 2015>

(10b) Primary Responsibilities:

  • CAESAR II Calculation Input and Analysis for Piperack and PSV Piping, including Sea Transportation
  • Performs NozzlePro Calculation for Nozzle Loads
  • Indicates correct support tag as per CAESAR II Calculation based on Support Standard
  • Performs Site Request Calculation (As built Lines)

ENI's COMMENTS
営業担当者からの紹介文

彼は2014年2月から現在までの経験を持つベテランの配管ストレスエンジニアです。2022年4月からの現職では、ASME B31.1/B31.3規格に準拠した配管システムの配管ストレスエンジニアリングを、CAESAR IIまたはAutoPipe Programを駆使して遂行しています。彼は2017年と2019年に2回、CHIYODA本社に3ヶ月間の出張経験があり、配管解析の支援に貢献しました。その際に日本の素晴らしい環境や食事に感銘を受け、日本での仕事を志願しています。人柄は自己紹介では「サイレント」と表現しておりましたが、真面目でコツコツと積み上げるタイプと思われます。趣味は映画鑑賞とバトミントンで、多彩な一面を持っています。

 